|
Investment
Environment

The Customs of the Development Zone |
With the Zone backing
on the city proper, investors can enjoy the present investment environment
which is getting perfect. The investment of the infrastructure in
the Zone has reached nearly 4 billion RMB yuan, and it has finished
the engineering of "seven passed and one leveled project",
which means water, electricity, gas, heat, road, telecommunication,
sewage disposal and level site, so it has provided convenient conditions
for production and dwelling.
Traffic

Weihai Railway Station |
The traffic in
the Development Zone is very convenient. The Qingwei and Yanwei
Expressway with two sides closed have been put into use. The Taowei
Raiway has started operation. Weihai Airport is at a distance of
20KM from the Zone, where there are airlines to Beijing, Jinan,
Harbin, Dalian, Guangzhou, Hainan, etc.. The chartered airplane
from Weihai to Seoul has been opened. Weihai New Harbour in the
Zone has a 50,000 tonnage liquid berth, 20,000 tonnage containerization
berth, 20,000 tonnage coalberth, 10,000 tonnage general berth, and
5000 tonnage passengers berth. Now there are passenger liner and
cargo liner from Weihai to Inchon, and cargo liners to Hongkong
and Japan.
Power
Weihai Power Plant
located in the Zone has a generating capacity of 2,050,000KW. The
generating unit with the capacity of 850,000KW has been put into
use.
Telecommunication
The telecommunication
enterprise is so developed that the engineering of the hub of the
telecomunication has reached the installation capacity of 19,000
lines of SPC telephone system to communicate with people all over
the world. The newly-built telecommunication system of the Zone
has the installation capacity of 60,000 lines, and the first international
satellite communication system in the nation to Korea has been opened.
The second customs office for international mails in Shandong Province
has been set up in Weihai.
Water Supply

Weihai Airport |
It has the abillity
of providing with 100,000 tons of water every day.
Heat Supply
It provides central
heat supply for enterprise and residents, the steam supply capacity
of the two heating power station is 170 tons per hour.
Drainage
It uses the multiple
drainage for rain and sewage. The sewage treatment plant has the
ability of 125,000 tons of sewage disposal every day.
Gas Supply
A gas factory that
can provide 160,000M3 of steam every day has been set up in the
Zone.
|